Nikon D7200, 12-24mm f/4G lens @12mm f/8, aperture priority. |
"Conservation and restoration has been carried out on various parts of the wall and on a few buildings. The Upper Peirene Spring received conservation and protective work around 1930. In 1965-66 the bridge over the dry moat and the guard house at the entrance were restored. In 1972-73 the wall between gates a and b was reinforced. In 1978 the northern end of the seconnd peribolos wall was reinforced, near the Kanoni site. In 1980 parts of the outer side of the third peribolos wall were reinforced. In 1993-95 the bridge over the moat was replaced and the wall between gates b and c were reinforced and parts of the calderimi paving repaired." — "Castle of Acrocorinth" Greek Travel Pages |